This prefab labor camp is totally set up with our new product folding container house. As customers’ required, we dispatched our installation engineer to guide on site.
Project Overview
Time: 2017
Location: Argentina
Type: Worker labor camp
Area: 1000m²
Challenges & Solution:
1. Tropical desert climate is the main factor that increased the difficulty of the project.Saudi Arabiais hot and dry. So we used hot and dry resistance sandwich panel, TPS sandwich panel, for wall and roof.
2. The project area is large, if we use traditional prefab house, it will cost too much time to finish this project. We choose to use folding container house, the construction time of which is just about 10 minutes one set. We succeed in cutting down the construction time.
Details:
STEEL: C section steel
ROOF: 50mm TPS sandwich panel
WALL: 50mm TPS sandwich panel
DOOR: TPS sandwich panel door
WINDOW: Aluminium alloy sliding window
FLOOR: Cement board